How to Calculate Bench Cost in an IT Consultancy
Bench cost is three numbers, not one: what the consultant costs you, the overhead they carry and the revenue the days could have earned. Here is how to calculate each with a worked example, why adding them double counts, and how sales can cut the bench days that were avoidable.
Bench cost is what an IT consultancy pays, and fails to earn, while a billable consultant has no client assignment. It is three separate numbers: the consultant’s direct employment cost for those days, the overhead allocated to them, and the billable revenue the days could have produced. The first two are paid whether the consultant bills or not; the third is an opportunity, and only part of it was ever recoverable.
Most bench reports add the lost day rate to the salary and present one figure, which counts the salary twice. Below: definitions, a worked example to rerun with your own inputs, utilisation targets, and what sales can do about avoidable bench days.
What bench time and bench days mean
Bench time is working time in which a billable consultant is available for client work but not assigned to any; a bench day is one working day of it, with half days counted as fractions. The definition only works if you separate it from non-billable time that was planned.
| Time category | Examples | Bench time? |
|---|---|---|
| Absence | Annual leave, public holidays, sick leave | No. Remove it from available time |
| Planned development | Training booked before the assignment ended | No |
| Planned internal work | Internal projects with an owner and a deliverable | No |
| Pre-sales and bids | Client workshops, proposals, tender responses | No, but track it separately |
| Unassigned | Between assignments, waiting for a start date | Yes |
| Filler | Training or internal tasks booked because nothing else was | Yes, whatever the timesheet says |
The cancellation test. If a client confirmed a start tomorrow, would today’s activity be dropped? If yes, it is bench time with a different label, and coding it as internal work hides exactly the days sales could have sold.
How do you calculate the cost of bench time in an IT consultancy?
Count the bench days for each consultant, then calculate three numbers separately: direct employment cost (salary plus employer charges per working day, times bench days), allocated overhead (overhead per working day, times bench days) and potential billable revenue not earned (day rate times bench days). Report them side by side, never as one total, because the revenue would have paid the other two.
The three formulas
- Direct employment cost = bench days × daily employment cost, where daily employment cost is annual gross salary plus employer social contributions and benefits, divided by working days in the year. Take it from payroll: Eurostat puts non-wage costs, mainly employer social contributions, at 24.8% of EU labour costs in 2025, from 32.3% in France to 4.8% in Romania, so one multiplier will not fit every office.
- Allocated overhead = bench days × overhead per working day (office, management, tooling, back office). A bench day creates no new overhead; it leaves the existing share unabsorbed.
- Potential billable revenue not earned = bench days × the day rate the consultant would realistically have billed.
Working days are weekdays minus public holidays and leave. EU rules guarantee at least four weeks of paid annual leave and many employers grant more, so use your own HR calendar.
A worked example
Every input below is invented for illustration, in euros. Swap in your own.
| Line | Example | Calculation |
|---|---|---|
| Day rate | 700 | Realistic rate for this profile |
| Annual employment cost | 88,000 | Payroll, including employer charges |
| Working days in the year | 220 | Weekdays minus public holidays and leave |
| Daily employment cost | 400 | 88,000 ÷ 220 |
| Allocated overhead per day | 100 | 22,000 allocated per consultant ÷ 220 |
| Bench days between two assignments | 15 | Resource plan |
| Result 1: direct employment cost | 6,000 | 400 × 15 |
| Result 2: allocated overhead | 1,500 | 100 × 15 |
| Result 3: billable revenue not earned | 10,500 | 700 × 15 |
Run this per consultant and sum each result in its own column, all the way to the management report.
How much revenue does a consultancy lose when consultants sit on the bench?
At most, the day rate times the bench days, summed across every unassigned consultant: 10,500 for the 15 days in the example. The real loss is smaller, because only the days that could actually have been sold count. Since salary and overhead are paid either way, the profit at stake equals that recoverable revenue, not revenue plus cost.
Why adding lost revenue to salary double counts
Had those days been billed, the 10,500 would have paid the 6,000 of employment cost and the 1,500 of overhead, leaving 3,000 of margin. On the bench, the firm still pays the 6,000 and the 1,500, so profit ends up 10,500 lower. Calling the bench cost 18,000 counts the cost twice: once as money paid, once inside the revenue that would have paid it.
Each number answers a different question. Employment cost is what the firm carries with no revenue against it, overhead is fixed cost left unabsorbed, and recoverable revenue is the profit at stake.
Not every bench day was sellable
A fixed client start date, a security clearance or a skill set with no current demand can all produce bench days no sales effort would fill. If 5 of the 15 days fell between a signed contract and a fixed start, recoverable revenue is 700 × 10 = 7,000, and that is the number to manage. Log a reason for every bench period. If bench keeps clustering around one profile, the problem is supply, and a skills gap analysis against recent client requests is the better next step.
What is a healthy utilisation rate for an IT consultancy?
There is no single healthy utilisation rate for an IT consultancy. Utilisation is billable hours divided by available hours, and the right target depends on the role, the delivery model and what counts as available. Set your own from break-even and from the non-billable time each role is meant to have.
The formula
Utilisation = billable hours ÷ available hours × 100, where available hours are contracted hours minus leave, public holidays and sickness. Dividing by contracted hours instead gives a lower figure for the same work. Either is defensible; mixing the two between teams is not.
Why targets differ by role
| Role | Planned non-billable time | Effect on the target |
|---|---|---|
| Delivery consultant, long assignment | Training, internal meetings | Highest in the firm |
| Lead consultant | Mentoring, pre-sales, bid reviews | Lower by design |
| First-year consultant | Onboarding, certifications | Ramps up through the year |
| Practice lead | Accounts, pre-sales, hiring | Part time, or measured on work sold |
How to set your own target
Start from break-even. In the example, each available day carries 400 of employment cost and 100 of overhead against a 700 day rate, so break-even is about 71% of available days: a floor for this profile, not a benchmark. Set the target above it, take out planned non-billable time, and what remains is the bench the plan can absorb.
The 80% is illustrative, not a recommendation. If the allowance comes out negative, the target and the plan contradict each other.
How a sales team reduces avoidable bench days
Structural bench days are a planning matter. The avoidable ones, lost because nobody saw a roll-off coming, a request sat unanswered or a CV was two projects out of date, belong to sales.
Track availability 30, 60 and 90 days ahead
Review roll-off dates weekly at 90, 60 and 30 days out, ask clients about extensions early, and make sure account managers know who is coming free before the consultant tells them.
Answer client requests faster
When a request goes to several suppliers, the first credible proposal becomes the one the others are compared against. Measure hours from request to proposal and remove the steps that add a day: finding who is free, checking recent work, rebuilding the CV. See answering client requests first for where those hours go.
Watch live assignment and vacancy signals in target accounts
A client hiring for a skill, publishing an assignment or issuing a tender shows demand before it reaches your inbox. Match those signals to consultants rolling off in the next 60 days, so account managers open with a named person.
Saply’s Vacancy Intelligence covers this step with a weekly scan of live vacancies matched to consultants already in the firm’s system. The limitation: matching finds openings that already exist, it cannot create demand or guarantee a placement, and many clients will still hire permanently. To size the problem, the bench cost calculator multiplies consultants on the bench, day rate and days before placement, which is Result 3 above, the revenue ceiling, before removing days that were never sellable.
Keep consultant CVs current
A proposal cannot go out the same day if the CV stops two projects ago. Ask consultants to update at every roll-off and quarterly on long assignments, and keep one master record per person, as our guide to CV management software explains.
Which tools help consultancies reduce bench time between assignments?
Four categories of tools reduce bench time, each at a different step: resource management and PSA tools for planning availability, a CRM for the pipeline, vacancy and assignment signals for work not yet in the pipeline, and CV tools for same-day proposals. Start with the step that loses your firm the most days.
| Category | Helps with | Cannot do |
|---|---|---|
| Resource management and PSA | Roll-off dates, leave, training, availability forecast | Find new work |
| CRM | Requests and opportunities with start dates | Show demand nobody logged |
| Vacancy and assignment signals | Live roles and tenders that fit who is free | Create demand |
| CV and proposal tools | Current CVs in the client’s template, same day | Fix a skills mismatch |
Saply works in the last two categories, alongside the planning tool and CRM a firm already runs. Whatever you choose, make sure availability, pipeline and CVs point at the same consultant record.
Frequently asked questions
Should training and pre-sales count as bench time?
Not when they were planned. Training booked before an assignment ended, and pre-sales on a live opportunity, are planned non-billable time. Training or internal tasks booked because there was no assignment are bench time.
Why not add lost revenue to salary cost to get one bench cost figure?
Because the revenue a consultant would have billed is what pays their salary and overhead. The salary is paid either way, so the profit lost equals the recoverable revenue, and adding the two counts the employment cost twice.
How far ahead should a consultancy track consultant availability?
Ninety days, reviewed weekly, with 60 and 30 days as checkpoints for extensions, CV refreshes and live proposals, is a practical horizon for most IT consultancies. Public sector work and tenders often need longer, because selection takes longer.
Who should own bench time, sales or resource management?
Both, with a clear split: resource management owns the forecast of who rolls off when, and sales owns the requests answered, proposals sent and assignments won. A shared weekly review of requests, response times and won or lost assignments keeps both looking at the same bench days.