How to Calculate Bench Cost in an IT Consultancy

Bench cost is three numbers, not one: what the consultant costs you, the overhead they carry and the revenue the days could have earned. Here is how to calculate each with a worked example, why adding them double counts, and how sales can cut the bench days that were avoidable.

Written by Saply Team
How to Calculate Bench Cost in an IT Consultancy

Bench cost is what an IT consultancy pays, and fails to earn, while a billable consultant has no client assignment. It is three separate numbers: the consultant’s direct employment cost for those days, the overhead allocated to them, and the billable revenue the days could have produced. The first two are paid whether the consultant bills or not; the third is an opportunity, and only part of it was ever recoverable.

Most bench reports add the lost day rate to the salary and present one figure, which counts the salary twice. Below: definitions, a worked example to rerun with your own inputs, utilisation targets, and what sales can do about avoidable bench days.

What bench time and bench days mean

Bench time is working time in which a billable consultant is available for client work but not assigned to any; a bench day is one working day of it, with half days counted as fractions. The definition only works if you separate it from non-billable time that was planned.

Time categoryExamplesBench time?
AbsenceAnnual leave, public holidays, sick leaveNo. Remove it from available time
Planned developmentTraining booked before the assignment endedNo
Planned internal workInternal projects with an owner and a deliverableNo
Pre-sales and bidsClient workshops, proposals, tender responsesNo, but track it separately
UnassignedBetween assignments, waiting for a start dateYes
FillerTraining or internal tasks booked because nothing else wasYes, whatever the timesheet says

The cancellation test. If a client confirmed a start tomorrow, would today’s activity be dropped? If yes, it is bench time with a different label, and coding it as internal work hides exactly the days sales could have sold.

How do you calculate the cost of bench time in an IT consultancy?

Count the bench days for each consultant, then calculate three numbers separately: direct employment cost (salary plus employer charges per working day, times bench days), allocated overhead (overhead per working day, times bench days) and potential billable revenue not earned (day rate times bench days). Report them side by side, never as one total, because the revenue would have paid the other two.

The three formulas

  • Direct employment cost = bench days × daily employment cost, where daily employment cost is annual gross salary plus employer social contributions and benefits, divided by working days in the year. Take it from payroll: Eurostat puts non-wage costs, mainly employer social contributions, at 24.8% of EU labour costs in 2025, from 32.3% in France to 4.8% in Romania, so one multiplier will not fit every office.
  • Allocated overhead = bench days × overhead per working day (office, management, tooling, back office). A bench day creates no new overhead; it leaves the existing share unabsorbed.
  • Potential billable revenue not earned = bench days × the day rate the consultant would realistically have billed.

Working days are weekdays minus public holidays and leave. EU rules guarantee at least four weeks of paid annual leave and many employers grant more, so use your own HR calendar.

A worked example

Every input below is invented for illustration, in euros. Swap in your own.

LineExampleCalculation
Day rate700Realistic rate for this profile
Annual employment cost88,000Payroll, including employer charges
Working days in the year220Weekdays minus public holidays and leave
Daily employment cost40088,000 ÷ 220
Allocated overhead per day10022,000 allocated per consultant ÷ 220
Bench days between two assignments15Resource plan
Result 1: direct employment cost6,000400 × 15
Result 2: allocated overhead1,500100 × 15
Result 3: billable revenue not earned10,500700 × 15

Run this per consultant and sum each result in its own column, all the way to the management report.

How much revenue does a consultancy lose when consultants sit on the bench?

At most, the day rate times the bench days, summed across every unassigned consultant: 10,500 for the 15 days in the example. The real loss is smaller, because only the days that could actually have been sold count. Since salary and overhead are paid either way, the profit at stake equals that recoverable revenue, not revenue plus cost.

EXAMPLE: ONE CONSULTANT, 15 BENCH DAYS 6,000 Direct employment cost 400 a day × 15 days 1,500 Allocated overhead 100 a day × 15 days 10,500 3,000 margin 7,500 would have paid the cost on the left Billable revenue not earned 700 day rate × 15 days Three separate numbers. Adding them counts the cost twice.

Why adding lost revenue to salary double counts

Had those days been billed, the 10,500 would have paid the 6,000 of employment cost and the 1,500 of overhead, leaving 3,000 of margin. On the bench, the firm still pays the 6,000 and the 1,500, so profit ends up 10,500 lower. Calling the bench cost 18,000 counts the cost twice: once as money paid, once inside the revenue that would have paid it.

Each number answers a different question. Employment cost is what the firm carries with no revenue against it, overhead is fixed cost left unabsorbed, and recoverable revenue is the profit at stake.

Not every bench day was sellable

A fixed client start date, a security clearance or a skill set with no current demand can all produce bench days no sales effort would fill. If 5 of the 15 days fell between a signed contract and a fixed start, recoverable revenue is 700 × 10 = 7,000, and that is the number to manage. Log a reason for every bench period. If bench keeps clustering around one profile, the problem is supply, and a skills gap analysis against recent client requests is the better next step.

What is a healthy utilisation rate for an IT consultancy?

There is no single healthy utilisation rate for an IT consultancy. Utilisation is billable hours divided by available hours, and the right target depends on the role, the delivery model and what counts as available. Set your own from break-even and from the non-billable time each role is meant to have.

The formula

Utilisation = billable hours ÷ available hours × 100, where available hours are contracted hours minus leave, public holidays and sickness. Dividing by contracted hours instead gives a lower figure for the same work. Either is defensible; mixing the two between teams is not.

Why targets differ by role

RolePlanned non-billable timeEffect on the target
Delivery consultant, long assignmentTraining, internal meetingsHighest in the firm
Lead consultantMentoring, pre-sales, bid reviewsLower by design
First-year consultantOnboarding, certificationsRamps up through the year
Practice leadAccounts, pre-sales, hiringPart time, or measured on work sold

How to set your own target

Start from break-even. In the example, each available day carries 400 of employment cost and 100 of overhead against a 700 day rate, so break-even is about 71% of available days: a floor for this profile, not a benchmark. Set the target above it, take out planned non-billable time, and what remains is the bench the plan can absorb.

EXAMPLE: 220 AVAILABLE DAYS, 80% TARGET 176 billable days 22 22 Break-even: about 157 days (71%) Billable at the 80% target: 176 days Planned non-billable: 22 days of training, pre-sales and internal work Bench allowance: 22 days the plan can absorb before the target is missed

The 80% is illustrative, not a recommendation. If the allowance comes out negative, the target and the plan contradict each other.

How a sales team reduces avoidable bench days

Structural bench days are a planning matter. The avoidable ones, lost because nobody saw a roll-off coming, a request sat unanswered or a CV was two projects out of date, belong to sales.

90 DAYS OUT 60 DAYS OUT 30 DAYS OUT ROLL-OFF Flag the roll-off Ask the client about an extension. Tell sales who is coming free, with which skills. Refresh and target Update the CV with the current project. Shortlist accounts with live demand for those skills. Proposals in play At least one proposal is with a client. Reply the same day to any request that fits. Bench clock starts Each unassigned working day from here is a bench day. Fallback training was planned, not invented.

Track availability 30, 60 and 90 days ahead

Review roll-off dates weekly at 90, 60 and 30 days out, ask clients about extensions early, and make sure account managers know who is coming free before the consultant tells them.

Answer client requests faster

When a request goes to several suppliers, the first credible proposal becomes the one the others are compared against. Measure hours from request to proposal and remove the steps that add a day: finding who is free, checking recent work, rebuilding the CV. See answering client requests first for where those hours go.

Watch live assignment and vacancy signals in target accounts

A client hiring for a skill, publishing an assignment or issuing a tender shows demand before it reaches your inbox. Match those signals to consultants rolling off in the next 60 days, so account managers open with a named person.

Saply’s Vacancy Intelligence covers this step with a weekly scan of live vacancies matched to consultants already in the firm’s system. The limitation: matching finds openings that already exist, it cannot create demand or guarantee a placement, and many clients will still hire permanently. To size the problem, the bench cost calculator multiplies consultants on the bench, day rate and days before placement, which is Result 3 above, the revenue ceiling, before removing days that were never sellable.

Keep consultant CVs current

A proposal cannot go out the same day if the CV stops two projects ago. Ask consultants to update at every roll-off and quarterly on long assignments, and keep one master record per person, as our guide to CV management software explains.

Which tools help consultancies reduce bench time between assignments?

Four categories of tools reduce bench time, each at a different step: resource management and PSA tools for planning availability, a CRM for the pipeline, vacancy and assignment signals for work not yet in the pipeline, and CV tools for same-day proposals. Start with the step that loses your firm the most days.

CategoryHelps withCannot do
Resource management and PSARoll-off dates, leave, training, availability forecastFind new work
CRMRequests and opportunities with start datesShow demand nobody logged
Vacancy and assignment signalsLive roles and tenders that fit who is freeCreate demand
CV and proposal toolsCurrent CVs in the client’s template, same dayFix a skills mismatch

Saply works in the last two categories, alongside the planning tool and CRM a firm already runs. Whatever you choose, make sure availability, pipeline and CVs point at the same consultant record.

Frequently asked questions

Should training and pre-sales count as bench time?

Not when they were planned. Training booked before an assignment ended, and pre-sales on a live opportunity, are planned non-billable time. Training or internal tasks booked because there was no assignment are bench time.

Why not add lost revenue to salary cost to get one bench cost figure?

Because the revenue a consultant would have billed is what pays their salary and overhead. The salary is paid either way, so the profit lost equals the recoverable revenue, and adding the two counts the employment cost twice.

How far ahead should a consultancy track consultant availability?

Ninety days, reviewed weekly, with 60 and 30 days as checkpoints for extensions, CV refreshes and live proposals, is a practical horizon for most IT consultancies. Public sector work and tenders often need longer, because selection takes longer.

Who should own bench time, sales or resource management?

Both, with a clear split: resource management owns the forecast of who rolls off when, and sales owns the requests answered, proposals sent and assignments won. A shared weekly review of requests, response times and won or lost assignments keeps both looking at the same bench days.